Planning pack for this site, £295Other options

Battery storage · United Kingdom

Little Raith (Gleniston, Auchtertool - Battery Storage Facility)

Operator Harmony Energy Limited · Owner Heit Lr Limited

Awaiting Construction49.5 MWData checked 16 November 2026Source record dated 11 November 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Little Raith (Gleniston, Auchtertool - Battery Storage Facility) is a 49.5 MW battery storage site 3.1 km south-east of Lochgelly, Fife, United Kingdom. Its planning application (22/02323/FULL) went to Fife on 12 July 2022 and was granted on 1 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 53 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

6 planned or unplanned unavailability notices published under REMIT, 9 Nov 2026 to 10 Nov 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.

Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.

HARMONY ENERGY LIMITED (10141078), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Little Raith (Gleniston, Auchtertool - Battery Storage Facility) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 303 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool303 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells360 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire497 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Harmony Energy Limited
Owner
Heit Lr Limited
Location
Battery Storage Facility Gleniston Auchtertool, Fife, KY5 0AX, United Kingdom
Planning authority
Fife
Planning application
22/02323/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02323/FULL, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 12 July 2022 Planning application submitted
  • 1 November 2022 Planning permission granted
  • 9 November 2025 Planning permission expired

None found. The register holds no published incident that names Little Raith (Gleniston, Auchtertool - Battery Storage Facility). If you know of one, report it (confidential reports are anonymised).

Has Little Raith (Gleniston, Auchtertool - Battery Storage Facility) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Little Raith (Gleniston, Auchtertool - Battery Storage Facility); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Little Raith (Gleniston, Auchtertool - Battery Storage Facility)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2022.
Where is Little Raith (Gleniston, Auchtertool - Battery Storage Facility)?
3.1 km south-east of Lochgelly, Fife, United Kingdom (postcode KY5 0AX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).