← Back to Glogovac
Planning pack for this site, £295Other options

Solar · Kosovo

Gjakova solar farm

Operator KOSTT · Owner Solar Energy Group Europe (SEGE) [100%]

Under construction150 MWData checked 12 November 2026Source record dated 3 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gjakova solar farm is a 150 MW solar farm 4.6 km south of Glogovac, Gjakova District, Glogovac, Kosovo. It first operated in 2026. Its status in the Global Energy Monitor solar and wind trackers is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 0 incidents at solar farms (hybrid battery and solar sites included) in Kosovo, and 480 worldwide.

No comparable incidents are recorded near this site yet.

The register holds no solar incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.

Order the pack for this site. £295, by email in minutes.

Technology
Solar
Capacity
150 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Under construction (Construction)
Operator
KOSTT
Owner
Solar Energy Group Europe (SEGE) [100%]
Location
Gjakova District, Glogovac, Kosovo
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Gjakova solar farm. If you know of one, report it (confidential reports are anonymised).

Has Gjakova solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Gjakova solar farm; it holds 0 incidents at solar farms (hybrid battery and solar sites included) in Kosovo.
What is the status of Gjakova solar farm?
Under construction, in the Global Energy Monitor solar and wind trackers, where it last changed on 3 January 2025.
Where is Gjakova solar farm?
4.6 km south of Glogovac, Gjakova District, Glogovac, Kosovo.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).