Battery storage · United Kingdom
Fosse Way - Battery Storage
Operator Staffordshire Solar 1 Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 4 August 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Fosse Way - Battery Storage is a battery storage site 4.1 km south-east of Royal Leamington Spa, Warwickshire, United Kingdom. Its planning application (W/24/1404) went to Warwick on 15 October 2024 and was granted on appeal on 14 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 48 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Fosse Way - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fosse Way - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 67 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 67 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 99 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 156 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Staffordshire Solar 1 Limited
- Location
- W/O Fosse Way, Se/O Radford Semele, Leamington Spa, Warwickshire, CV31 1XJ, United Kingdom
- Planning authority
- Warwick
- Planning application
- W/24/1404
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for W/24/1404, with what the planning evidence pack adds for this site.
Every application in Warwick · Alerts for applications and incidents near here
Status changed from Application Refused to Awaiting Construction on 16 November 2026.
Timeline
- 15 October 2024 Planning application submitted
- 22 May 2025 Planning permission refused
- 14 May 2026 Planning permission granted
- 14 May 2026 Appeal granted
Incidents on the register at this site
None found. The register holds no published incident that names Fosse Way - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Fosse Way - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Fosse Way - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Fosse Way - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Fosse Way - Battery Storage?
- 4.1 km south-east of Royal Leamington Spa, Warwickshire, United Kingdom (postcode CV31 1XJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).