Battery storage · United Kingdom
Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage
Operator Fenmarc Produce Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 13 October 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage is a battery storage site 4 km south-east of Wisbech, Cambridgeshire, United Kingdom. Its planning application (F/YR23/0329/F) went to Fenland on 12 April 2023 and was granted on 12 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 103 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 103 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 129 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 177 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Fenmarc Produce Limited
- Location
- Fenmarc Produce Limited, 178 Gosmoor Lane, Cambridgeshire, PE14 0EG, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/YR23/0329/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/YR23/0329/F, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 12 April 2023 Planning application submitted
- 12 October 2023 Planning permission granted
- 12 October 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 October 2023.
- Where is Fenmarc Produce, Gosmoor Lane - Solar Farm & Battery Storage?
- 4 km south-east of Wisbech, Cambridgeshire, United Kingdom (postcode PE14 0EG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).