← Back to California
Planning pack for this site, £295Other options

Battery storage · United States

Elevate Pier S

Operator Lighthouse Pier S, LLC

Planned70 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Elevate Pier S is a 70 MW battery storage site 3.2 km west of Long Beach, Los Angeles County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 27 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Elevate Pier S sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0115, Battery storage fire triggers evacuation near Santa Ana industrial site, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01152024Battery storage fire triggers evacuation near Santa Ana industrial site32 kmSignificant
EIR-11782026Lithium ion battery fire at Metropolitan Water District facility La Verne56 kmSignificant
EIR-00992026Battery storage fire at Creekside Marketplace EV charging station in San Marcos120 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
70 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Lighthouse Pier S, LLC
Owner
Lighthouse Pier S, LLC
Location
Los Angeles County, California, United States
Expected
2026
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Elevate Pier S. If you know of one, report it (confidential reports are anonymised).

Has Elevate Pier S had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Elevate Pier S; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Elevate Pier S?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Elevate Pier S?
3.2 km west of Long Beach, Los Angeles County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).