← Back to Minnesota
Planning pack for this site, launch price £145Other options

Solar · United States

EESolar29

Under construction5 MWChecked 26 October 2026

EESolar29 is a 5 MW solar farm 7.1 km north of Sartell, Stearns County, Minnesota, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 154 incidents at solar farms in the United States, and 390 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for EESolar29 sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, launch price £145 See a sample pack (PDF)

The pack for this site lists 154 comparable solar incidents in the United States, nearest first. The nearest is EIR-1414, Tornado damages solar array at Camp Ripley in Minnesota, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14142016Tornado damages solar array at Camp Ripley in Minnesota34 kmSignificant
EIR-14562026Solar panel roof fire at Middleton Operations Center472 kmMinor
EIR-14432024Solar panel fire on Madison home roof extinguished by firefighters481 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 151 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Status
Under construction
Operator
EESolar29 LLC
Location
Stearns County, Minnesota, United States
Expected
2027
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names EESolar29. If you know of one, report it (confidential reports are anonymised).

Has EESolar29 had a fire or other incident?
None is on the register as of 29 October 2026. The register holds no published incident that names EESolar29; it holds 154 incidents at solar farms in the United States.
What is the status of EESolar29?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is EESolar29?
7.1 km north of Sartell, Stearns County, Minnesota, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).