Planning pack for this site, £295Other options

Battery storage · United Kingdom

Doogary Road, Omagh - Battery Storage

Operator Omagh BES Limited

Awaiting Construction40 MWData checked 16 November 2026Source record dated 13 January 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Doogary Road, Omagh - Battery Storage is a 40 MW battery storage site 3.3 km south-east of Omagh, Co. Fermanagh, United Kingdom. Its planning application (LA10/2023/1605/F) went to Fermanagh and Omagh on 30 March 2023 and was granted on 13 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Doogary Road, Omagh - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 314 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool314 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells435 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire477 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Omagh BES Limited
Location
160m Northwest Of No 80 Doogary Road, Omagh, Co. Fermanagh, BT79 0BJ, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
LA10/2023/1605/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA10/2023/1605/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 30 March 2023 Planning application submitted
  • 13 December 2024 Planning permission granted
  • 13 December 2029 Planning permission runs out

None found. The register holds no published incident that names Doogary Road, Omagh - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Doogary Road, Omagh - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Doogary Road, Omagh - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Doogary Road, Omagh - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
Where is Doogary Road, Omagh - Battery Storage?
3.3 km south-east of Omagh, Co. Fermanagh, United Kingdom (postcode BT79 0BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).