Planning pack for this site, £295Other options

Battery storage · United Kingdom

DEVILL

Operator ALCEMI STORAGE DEVELOPMENTS 3 LIMITED

Awaiting Construction300 MWData checked 5 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

DEVILL is a 300 MW battery storage site 6.4 km north of Bo’ness, United Kingdom. Its status in the public dataset is awaiting construction. There are 29 other energy sites within 10 km, 12 of them battery storage sites. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for DEVILL sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 301 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool301 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells367 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire497 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
300 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2027, agreement awarded)
Operator
ALCEMI STORAGE DEVELOPMENTS 3 LIMITED
Location
KY12 8EW, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names DEVILL. If you know of one, report it (confidential reports are anonymised).

Has DEVILL had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names DEVILL; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of DEVILL?
Awaiting Construction, in the public dataset.
Where is DEVILL?
6.4 km north of Bo’ness, United Kingdom (postcode KY12 8EW).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).