← Back to Lancashire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Davies Road - Whitebirk Battery Storage

Operator Field · Owner Field Whitebirk LTD

Awaiting Construction25 MWData checked 16 November 2026Source record dated 23 August 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Davies Road - Whitebirk Battery Storage is a 25 MW battery storage site on the edge of Blackburn, Lancashire, United Kingdom. Its planning application (11/21/0483) went to Blackburn with Darwen on 4 August 2021 and was granted on 2 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 46 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

22 Oct20 Nov
WholesaleQuick ReserveDynamic ContainmentDynamic RegulationDynamic ModerationBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 7 Nov: 1,001 MWh out and 1,142 MWh in, active 87% of half hours, peak 13 MW of 25. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Davies Road - Whitebirk Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 51 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool51 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells113 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire229 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Field
Owner
Field Whitebirk LTD
Location
Davies Road, Blackburn, Lancashire, BB1 3HR, United Kingdom
Planning authority
Blackburn with Darwen
Planning application
11/21/0483

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/21/0483, with what the planning evidence pack adds for this site.

Every application in Blackburn with Darwen · Alerts for applications and incidents near here

  • 4 August 2021 Planning application submitted
  • 2 March 2022 Planning permission granted
  • 17 March 2025 Planning permission expired

None found. The register holds no published incident that names Davies Road - Whitebirk Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Davies Road - Whitebirk Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Davies Road - Whitebirk Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Davies Road - Whitebirk Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2024.
Where is Davies Road - Whitebirk Battery Storage?
On the edge of Blackburn, Lancashire, United Kingdom (postcode BB1 3HR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).