Battery storage · United Kingdom

Daines Battery Energy Storage System

Operator SSE Daines BESS Limited

Awaiting Construction600 MWData checked 16 November 2026Source record dated 10 June 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Daines Battery Energy Storage System is a 600 MW battery storage site 3.4 km east of Partington, Greater Manchester, United Kingdom. Its planning application (115160/FUL/24) went to Trafford on 3 October 2024 and was granted on 15 May 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 102 other energy sites within 10 km, 35 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SSE DAINES BESS LIMITED (15344013), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Daines Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool36 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells90 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire192 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
600 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
SSE Daines BESS Limited
Owner
SSE Daines BESS Limited
Location
N/O Ashton Road, Carrington, Manchester, Greater Manchester, M31 4AP, United Kingdom
Planning authority
Trafford
Planning application
115160/FUL/24

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 115160/FUL/24, with what the planning evidence pack adds for this site.

Every application in Trafford · Alerts for applications and incidents near here

  • 3 October 2024 Planning application submitted
  • 15 May 2025 Planning permission granted
  • 15 May 2028 Planning permission runs out

None found. The register holds no published incident that names Daines Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Daines Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Daines Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Daines Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2025.
Where is Daines Battery Energy Storage System?
3.4 km east of Partington, Greater Manchester, United Kingdom (postcode M31 4AP).