Planning pack for this site, £295Other options

Battery storage · United Kingdom

Cheltenham General Hospital - Battery Energy Storage System

Operator Gloucestershire Hospitals NHS Foundation Trust

Awaiting Construction2.2 MWData checked 16 November 2026Source record dated 15 September 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cheltenham General Hospital - Battery Energy Storage System is a 2.2 MW battery storage site in Cheltenham, Gloucestershire, United Kingdom. Its planning application (21/01884/FUL) went to Cheltenham on 20 August 2021 and was granted on 28 September 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cheltenham General Hospital - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire22 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells151 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter161 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
2.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gloucestershire Hospitals NHS Foundation Trust
Location
Cheltenham General Hospital, Sandford Road, Cheltenham, Gloucestershire, GL53 7AN, United Kingdom
Planning authority
Cheltenham
Planning application
21/01884/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/01884/FUL, with what the planning evidence pack adds for this site.

Every application in Cheltenham · Alerts for applications and incidents near here

  • 20 August 2021 Planning application submitted
  • 28 September 2021 Planning permission granted
  • 28 September 2024 Planning permission expired

None found. The register holds no published incident that names Cheltenham General Hospital - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Cheltenham General Hospital - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cheltenham General Hospital - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cheltenham General Hospital - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 September 2022.
Where is Cheltenham General Hospital - Battery Energy Storage System?
In Cheltenham, Gloucestershire, United Kingdom (postcode GL53 7AN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).