Challoch, Barnkirk Road - Solar Array & Battery Energy Storage

Operator Shropshire Council

Awaiting Construction6 MWData checked 16 November 2026Source record dated 25 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Challoch, Barnkirk Road - Solar Array & Battery Energy Storage is a 6 MW battery storage site 33 km east of Stranraer, Dumfries and Galloway, United Kingdom. Its planning application (25/1034/FUL) went to Dumfries and Galloway on 5 June 2025 and was granted on 21 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Challoch, Barnkirk Road - Solar Array & Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 205 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool205 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells303 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire401 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Shropshire Council
Location
South Of Challoch, And To The West Of The U52w Barnkirk Road, Dumfries and Galloway, DG8 6RB, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
25/1034/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/1034/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 5 June 2025 Planning application submitted
  • 21 July 2026 Planning permission granted
  • 21 July 2029 Planning permission runs out

None found. The register holds no published incident that names Challoch, Barnkirk Road - Solar Array & Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Challoch, Barnkirk Road - Solar Array & Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Challoch, Barnkirk Road - Solar Array & Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Challoch, Barnkirk Road - Solar Array & Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Challoch, Barnkirk Road - Solar Array & Battery Energy Storage?
33 km east of Stranraer, Dumfries and Galloway, United Kingdom (postcode DG8 6RB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).