← Back to Texas
Planning pack for this site, launch price £145Other options

Battery storage · United States

CF BESS NINE

Planned9.9 MWChecked 26 October 2026

CF BESS NINE is a 9.9 MW battery storage site 16 km south-west of Luling, Guadalupe County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There is one other energy site within 10 km. The register holds no incident at this site. It holds 57 incidents at battery storage sites in the United States, and 189 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for CF BESS NINE sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, launch price £145 See a sample pack (PDF)

The pack for this site lists 52 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1227, Firefighters respond to a battery storage fire in Mission, Texas, 379 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12272026Firefighters respond to a battery storage fire in Mission, Texas379 kmSignificant
EIR-16522026Small fire contained at Terra-Gen battery storage in Valley Center918 kmMinor
EIR-00252022Battery storage fire at Dorman facility in Chandler, Arizona, managed with robotic entry1396 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 49 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
9.9 MW
Status
Planned
Operator
CF BESS Nine, LLC
Location
Guadalupe County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names CF BESS NINE. If you know of one, report it (confidential reports are anonymised).

Has CF BESS NINE had a fire or other incident?
None is on the register as of 29 October 2026. The register holds no published incident that names CF BESS NINE; it holds 57 incidents at battery storage sites in the United States.
What is the status of CF BESS NINE?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is CF BESS NINE?
16 km south-west of Luling, Guadalupe County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).