Planning pack for this site, £295Other options

Battery storage · Australia

Calala BESS A1

Owner GP Energy (CAL A1) Asset CT Pty Ltd (ACN 679 229 586) as trustee for GP Energy (CAL A1) Asset Trust (ABN 51 366 899 733)

Under Construction108 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Calala BESS A1 is a 108 MW battery storage site New South Wales, Australia. Its status in the OpenElectricity facility data (Australia) is under construction. The register holds no incident at this site. It holds 7 incidents at battery storage sites (hybrid battery and solar sites included) in Australia, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Calala BESS A1 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in Australia, grid-scale only, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-04112025Transformer failure reduces capacity at Waratah Super Battery in New South Walesnot mappedSignificant
EIR-00352023Battery unit fire during commissioning at Bouldercombe Battery Project, Rockhamptonnot mappedMinor
EIR-13872022Fire damages engine room at Nova power stationnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stored energy 199.9 MWh, Lithium-ion)
Capacity
108 MW
Capacity figure from
OpenElectricity facility data (Australia)
Status
Under Construction (Committed)
Owner
GP Energy (CAL A1) Asset CT Pty Ltd (ACN 679 229 586) as trustee for GP Energy (CAL A1) Asset Trust (ABN 51 366 899 733)
Location
New South Wales, Australia

None found. The register holds no published incident that names Calala BESS A1. If you know of one, report it (confidential reports are anonymised).

Has Calala BESS A1 had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Calala BESS A1; it holds 7 incidents at battery storage sites (hybrid battery and solar sites included) in Australia.
What is the status of Calala BESS A1?
Under Construction, in the OpenElectricity facility data (Australia).
Where is Calala BESS A1?
New South Wales, Australia.

Source: OpenElectricity (formerly OpenNEM) facility data, licensed under CC BY 4.0. The dataset. The register adds only the incidents and the counts.