Battery storage · United Kingdom
Brynwell Farm
Operator Brynwell Farm Solar Limited
Awaiting ConstructionData checked 16 November 2026Source record dated 16 February 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Brynwell Farm is a battery storage site on the edge of Dinas Powys, South Glamorgan, United Kingdom. Its planning application (DNS/3261558) went to Welsh Government (NSIP) on 21 April 2021 and was granted on 10 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 74 other energy sites within 10 km, 30 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Brynwell Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brynwell Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 82 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 82 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 93 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 216 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Brynwell Farm Solar Limited
- Location
- Brynwell Farm, on land between the A4232 and Leckwith village, South Glamorgan, CF11 8AS, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3261558
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DNS/3261558, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 21 April 2021 Planning application submitted
- 10 November 2022 Planning permission granted
- 10 November 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Brynwell Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Brynwell Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Brynwell Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Brynwell Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
- Where is Brynwell Farm?
- On the edge of Dinas Powys, South Glamorgan, United Kingdom (postcode CF11 8AS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).