Battery storage · United Kingdom

Bradley Road - Battery Energy Storage System

Operator Renewable Connections Developments Limited · Owner Rivington Energy Limited

Awaiting Construction10 MWData checked 16 November 2026Source record dated 3 May 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bradley Road - Battery Energy Storage System is a 10 MW battery storage site 3.6 km north-west of Waltham, Lincolnshire, United Kingdom. Its planning application (DM/1156/23/FUL) went to North East Lincolnshire on 28 November 2023 and was granted on 26 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 53 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

RENEWABLE CONNECTIONS DEVELOPMENTS LIMITED (12351905), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bradley Road - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 81 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells81 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool186 kmMajor
EIR-01092025Fire in single battery unit at Thurrock BESS under construction232 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Renewable Connections Developments Limited
Owner
Rivington Energy Limited
Location
W/O Bradley Road, Grimsby, Lincolnshire, DN37 0AG, United Kingdom
Planning authority
North East Lincolnshire
Planning application
DM/1156/23/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/1156/23/FUL, with what the planning evidence pack adds for this site.

Every application in North East Lincolnshire · Alerts for applications and incidents near here

  • 28 November 2023 Planning application submitted
  • 26 April 2024 Planning permission granted
  • 26 April 2027 Planning permission runs out

None found. The register holds no published incident that names Bradley Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Bradley Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bradley Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bradley Road - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
Where is Bradley Road - Battery Energy Storage System?
3.6 km north-west of Waltham, Lincolnshire, United Kingdom (postcode DN37 0AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).