Solar · Sierra Leone

Bo-Kenema solar farm

Operational25 MWChecked 8 October 2026Last changed in the dataset 25 September 2025

Technology
Solar
Capacity
25 MW
Status
Operational (Operating)
Owner
Serengeti Energy [100%]
Location
Yamandu, Sierra Leone
First operating
2022
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Bo-Kenema solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.