← Back to Ayrshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Benthead Farm - Solar Farm & Battery Storage

Operator Locogen Limited · Owner Benthead Solar Limited

Awaiting Construction31.1 MWData checked 16 November 2026Source record dated 3 February 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Benthead Farm - Solar Farm & Battery Storage is a 31.1 MW battery storage site 4.9 km north-east of Kilwinning, Ayrshire, United Kingdom. Its planning application (ECU00004702) went to Scottish Government (S36) on 12 December 2022 and was granted on 11 August 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 38 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

LOCOGEN LIMITED (SC370060), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Benthead Farm - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 278 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool278 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells365 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire476 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
31.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Locogen Limited
Owner
Benthead Solar Limited
Location
Benhead Farm, Kilwinning, Ayrshire, KA13 7RU, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004702

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004702, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 12 December 2022 Planning application submitted
  • 11 August 2023 Planning permission granted
  • 11 August 2028 Planning permission runs out

None found. The register holds no published incident that names Benthead Farm - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Benthead Farm - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Benthead Farm - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Benthead Farm - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 February 2022.
Where is Benthead Farm - Solar Farm & Battery Storage?
4.9 km north-east of Kilwinning, Ayrshire, United Kingdom (postcode KA13 7RU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).