← Back to Strabane
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Battery Energy Storage Facility Development in Derry

Operator Heron Property Limited

Awaiting Construction17 MWData checked 16 November 2026Source record dated 13 January 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Battery Energy Storage Facility Development in Derry is a 17 MW battery storage site on the edge of Derry, Strabane, United Kingdom. Its planning application (LA11/2025/0092/F) went to Derry City and Strabane on 5 February 2025 and was granted on 19 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Energy Storage Facility Development in Derry sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 339 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool339 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells457 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire513 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
17 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Heron Property Limited
Location
Lands Approximately 64 M Sw/o 18 Balliniska Rd., Approximately 80 M SE/o Springtown Industrial Estate, Strabane, BT48 0NA, United Kingdom
Planning authority
Derry City and Strabane
Planning application
LA11/2025/0092/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA11/2025/0092/F, with what the planning evidence pack adds for this site.

Every application in Derry City and Strabane · Alerts for applications and incidents near here

  • 5 February 2025 Planning application submitted
  • 19 December 2025 Planning permission granted

None found. The register holds no published incident that names Battery Energy Storage Facility Development in Derry. If you know of one, report it (confidential reports are anonymised).

Has Battery Energy Storage Facility Development in Derry had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Battery Energy Storage Facility Development in Derry; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Battery Energy Storage Facility Development in Derry?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2026.
Where is Battery Energy Storage Facility Development in Derry?
On the edge of Derry, Strabane, United Kingdom (postcode BT48 0NA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).