← Back to Fife
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Balsillie Avenue - Roaring Hill Energy Storage Facility

Operator Tag Energy UK

Under Construction19.9 MWData checked 16 November 2026Source record dated 15 September 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Balsillie Avenue - Roaring Hill Energy Storage Facility is a 19.9 MW battery storage site on the edge of Glenrothes, Fife, United Kingdom. Its planning application (21/01438/FULL) went to Fife on 25 May 2021 and was granted on 3 September 2021. Construction started on 12 September 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 41 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Balsillie Avenue - Roaring Hill Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 313 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool313 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells369 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire506 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
19.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Tag Energy UK
Location
E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes, Fife, KY12 7DR, United Kingdom
Planning authority
Fife
Planning application
21/01438/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/01438/FULL, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 25 May 2021 Planning application submitted
  • 3 September 2021 Planning permission granted
  • 12 September 2022 Construction started

None found. The register holds no published incident that names Balsillie Avenue - Roaring Hill Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Balsillie Avenue - Roaring Hill Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Balsillie Avenue - Roaring Hill Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Balsillie Avenue - Roaring Hill Energy Storage Facility?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 September 2022.
Where is Balsillie Avenue - Roaring Hill Energy Storage Facility?
On the edge of Glenrothes, Fife, United Kingdom (postcode KY12 7DR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).