Onshore wind · Philippines

Bais (Envision Energy) Wind Project

Planned (permitted)150 MWChecked 8 October 2026Last changed in the dataset 9 May 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bais (Envision Energy) Wind Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
150 MW
Status
Planned (permitted) (Pre-construction)
Owner
Envision Energy Philippines Corp
Location
Bais City, Negros Oriental, Philippines
First operating
2033

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Bais (Envision Energy) Wind Project. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.