Archway Travel, Copse Road - Battery Storage Facility is a battery storage site on the edge of Fleetwood, Lancashire, United Kingdom. Its planning application (23/00298/FUL) went to Wyre on 20 March 2023 and was granted on 29 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Archway Travel, Copse Road - Battery Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Archway Travel, Copse Road - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 58 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 58 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 154 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 255 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Renepower Energy Limited
- Location
- Archway Travel, Copse Road, Fleetwood, Lancashire, FY7 7NY, United Kingdom
- Planning authority
- Wyre
- Planning application
- 23/00298/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00298/FUL, with what the planning evidence pack adds for this site.
Every application in Wyre · Alerts for applications and incidents near here
Timeline
- 20 March 2023 Planning application submitted
- 29 June 2023 Planning permission granted
- 29 June 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Archway Travel, Copse Road - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Archway Travel, Copse Road - Battery Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Archway Travel, Copse Road - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Archway Travel, Copse Road - Battery Storage Facility?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 July 2023.
- Where is Archway Travel, Copse Road - Battery Storage Facility?
- On the edge of Fleetwood, Lancashire, United Kingdom (postcode FY7 7NY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).