Battery storage · United Kingdom
Aldershot Road, Fairlands - Micro Energy Storage Unit
Operator Aggregated Micro Power Holdings Plc · Owner Fossa Holdco Limited
Revised0.2 MWData checked 16 November 2026Source record dated 27 August 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Aldershot Road, Fairlands - Micro Energy Storage Unit is a 0.2 MW battery storage site 4.6 km north-west of Guildford, Surrey, United Kingdom. Its planning application (24/P/01144) went to Guildford on 31 July 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 24 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Aldershot Road, Fairlands - Micro Energy Storage Unit changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
AGGREGATED MICRO POWER HOLDINGS LIMITED (08372177), active, since 2013. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aldershot Road, Fairlands - Micro Energy Storage Unit sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 76 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 76 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 104 km | Significant |
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 208 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Aggregated Micro Power Holdings Plc
- Owner
- Fossa Holdco Limited
- Location
- Grass verge near 45 St Michaels Avenue, Surrey, GU3 3LY, United Kingdom
- Planning authority
- Guildford
- Planning application
- 24/P/01144
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/P/01144, with what the planning evidence pack adds for this site.
Every application in Guildford · Alerts for applications and incidents near here
Timeline
- 31 July 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Aldershot Road, Fairlands - Micro Energy Storage Unit. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Aldershot Road, Fairlands - Micro Energy Storage Unit had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Aldershot Road, Fairlands - Micro Energy Storage Unit; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Aldershot Road, Fairlands - Micro Energy Storage Unit?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 27 August 2024.
- Where is Aldershot Road, Fairlands - Micro Energy Storage Unit?
- 4.6 km north-west of Guildford, Surrey, United Kingdom (postcode GU3 3LY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).