Solar · United Arab Emirates
Al Khazna solar farm
Planned (permitted)1500 MWChecked 8 October 2026Last changed in the dataset 3 December 2025
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Al Khazna solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
The site
- Technology
- Solar
- Capacity
- 1500 MW
- Status
- Planned (permitted) (Pre-construction)
- Operator
- ENGIE; Masdar Clean Energy
- Owner
- Emirates Water and Electricity Company PJSC
- Location
- Al Khazna, Abu Dhabi Emirate, United Arab Emirates
- First operating
- 2027
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Al Khazna solar farm. If you know of one, report it (confidential reports are anonymised).
Follow Al Khazna solar farm
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.