Battery storage · United States
AGATE BESS
Operator BrightNight Power · Owner AGAT bn, LLC
Planned170 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
AGATE BESS is a 170 MW battery storage site 4.7 km north-east of Poulsbo, Kitsap County, Washington, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.
Get an email when AGATE BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for AGATE BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0666, Fire during new product testing of Powin batteries in Tualatin, Oregon, 266 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0666 | 2019 | Fire during new product testing of Powin batteries in Tualatin, Oregon | 266 km | Significant |
| EIR-0653 | 2023 | Battery storage fire burns for days at Idaho Power substation near Melba | 680 km | Significant |
| EIR-0684 | 2022 | Lead-acid battery container explodes at Rio Dell RV park | 817 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage
- Capacity
- 170 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Planned
- Operator
- BrightNight Power
- Owner
- AGAT bn, LLC
- Location
- Kitsap County, Washington, United States
- Expected
- 2029
- Balancing authority
- PSEI
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names AGATE BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has AGATE BESS had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names AGATE BESS; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
- What is the status of AGATE BESS?
- Planned, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is AGATE BESS?
- 4.7 km north-east of Poulsbo, Kitsap County, Washington, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).