Battery storage · United States

AGATE BESS

Operator BrightNight Power · Owner AGAT bn, LLC

Planned170 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

AGATE BESS is a 170 MW battery storage site 4.7 km north-east of Poulsbo, Kitsap County, Washington, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for AGATE BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0666, Fire during new product testing of Powin batteries in Tualatin, Oregon, 266 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06662019Fire during new product testing of Powin batteries in Tualatin, Oregon266 kmSignificant
EIR-06532023Battery storage fire burns for days at Idaho Power substation near Melba680 kmSignificant
EIR-06842022Lead-acid battery container explodes at Rio Dell RV park817 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
170 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
BrightNight Power
Owner
AGAT bn, LLC
Location
Kitsap County, Washington, United States
Expected
2029
Balancing authority
PSEI

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names AGATE BESS. If you know of one, report it (confidential reports are anonymised).

Has AGATE BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names AGATE BESS; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of AGATE BESS?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is AGATE BESS?
4.7 km north-east of Poulsbo, Kitsap County, Washington, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).