Battery storage · United Kingdom
Admiralty Road - Battery Energy Storage Facility
Operator Abbey Power Solution Limited
Awaiting Construction50 MWData checked 16 November 2026Source record dated 29 July 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Admiralty Road - Battery Energy Storage Facility is a 50 MW battery storage site in Gorleston-on-Sea, Norfolk, United Kingdom. Its planning application (06/24/0123/F) went to Great Yarmouth on 25 April 2024 and was granted on 10 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Admiralty Road - Battery Energy Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Admiralty Road - Battery Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 152 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 152 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 200 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 268 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Abbey Power Solution Limited
- Location
- South & E/o Admiralty Road, South Denes, Great Yarmouth, Norfolk, NR30 3QR, United Kingdom
- Planning authority
- Great Yarmouth
- Planning application
- 06/24/0123/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 06/24/0123/F, with what the planning evidence pack adds for this site.
Every application in Great Yarmouth · Alerts for applications and incidents near here
Timeline
- 25 April 2024 Planning application submitted
- 10 July 2025 Planning permission granted
- 10 July 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Admiralty Road - Battery Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Admiralty Road - Battery Energy Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Admiralty Road - Battery Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Admiralty Road - Battery Energy Storage Facility?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2025.
- Where is Admiralty Road - Battery Energy Storage Facility?
- In Gorleston-on-Sea, Norfolk, United Kingdom (postcode NR30 3QR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).