Battery storage · United Kingdom

Adj To The A614 - Solar

Operator One Planet Developments Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 12 May 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Adj To The A614 - Solar is a battery storage site 7.8 km south-west of Retford, Nottinghamshire, United Kingdom. Its planning application (24/00384/FUL) went to Bassetlaw on 10 April 2024 and was granted on 7 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ONE PLANET DEVELOPMENTS LIMITED (12261202), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Adj To The A614 - Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells18 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool127 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire183 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
One Planet Developments Limited
Location
Normanton Larches, Blyth Road, Worksop, Nottinghamshire, Nottinghamshire, S81 0HP, United Kingdom
Planning authority
Bassetlaw
Planning application
24/00384/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00384/FUL, with what the planning evidence pack adds for this site.

Every application in Bassetlaw · Alerts for applications and incidents near here

  • 10 April 2024 Planning application submitted
  • 7 April 2026 Planning permission granted
  • 7 April 2029 Planning permission runs out

None found. The register holds no published incident that names Adj To The A614 - Solar. If you know of one, report it (confidential reports are anonymised).

Has Adj To The A614 - Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Adj To The A614 - Solar; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Adj To The A614 - Solar?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
Where is Adj To The A614 - Solar?
7.8 km south-west of Retford, Nottinghamshire, United Kingdom (postcode S81 0HP).