Around this site

← Back to Red Sea

Onshore wind · Egypt

ACWA Hurghada wind farm

Planned (permitted)2000 MWChecked 8 October 2026Last changed in the dataset 26 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for ACWA Hurghada wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
2000 MW
Status
Planned (permitted) (Pre-construction)
Operator
ACWA Power
Location
Red Sea, Egypt

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names ACWA Hurghada wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.