← Back to Highland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Acheilidh Wind Farm (Previously known as Lairg III)

Operator Energiekontor (UK) Limited · Owner Energiekontor AG

Application Submitted5 MWData checked 16 November 2026Source record dated 10 June 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Acheilidh Wind Farm (Previously known as Lairg III) is a 5 MW battery storage site Highland, United Kingdom. Its planning application (ECU00004528) went to Scottish Government (S36) on 7 May 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There is one other energy site within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Acheilidh Wind Farm (Previously known as Lairg III) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 551 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool551 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells619 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire749 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Energiekontor (UK) Limited
Owner
Energiekontor AG
Location
Sw/O Tigh An Alt Acheilidh, Rogart, Highland, IV27 4JB, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004528

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004528, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 7 May 2024 Planning application submitted

None found. The register holds no published incident that names Acheilidh Wind Farm (Previously known as Lairg III). If you know of one, report it (confidential reports are anonymised).

Has Acheilidh Wind Farm (Previously known as Lairg III) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Acheilidh Wind Farm (Previously known as Lairg III); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Acheilidh Wind Farm (Previously known as Lairg III)?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2024.
Where is Acheilidh Wind Farm (Previously known as Lairg III)?
Highland, United Kingdom (postcode IV27 4JB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.