Energy sites / United Kingdom / Redcar and Cleveland
Battery, solar and wind sites in Redcar and Cleveland
12 sites in Redcar and Cleveland, United Kingdom: 3 battery storage sites, 9 substations. 11 operating, 1 being built. Each page shows the site's status and dates, any incident on the register that names it, and the incidents at sites like it.
3battery storage sites
9substations
1being built
Battery storageSolarOnshore windOffshore windData centreSubstationFaded: refused, withdrawn or closed
Sites near a place
Every site in Redcar and Cleveland
- South Tees BESS
- "Sembcorp Uk Headquarters Battery Storage (Wilton International)
- Guisborough Woods ESS
- Wilton Substation
- Lackenby Substation
- Sofia Wind Farm Converter Station
- Dogger Bank C Wind Farm Converter station
- Nunthorpe 400KV Cable Compound
- Grangetown Substation
- Greystones A
- Greystones B
- Tod Point Substation
Source: OpenStreetMap contributors, licensed under the Open Database Licence (ODbL), openstreetmap.org/copyright.