Xinjiang Alashankou Phase 1 Wind

Operational49 MWChecked 6 October 2026

Technology
Onshore wind
Capacity
49 MW
Status
Operational (Operational as reported in 2021)
Location
, China

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Alashankou Phase 1 Wind. If you know of one, report it (confidential reports are anonymised).

The register holds 7 incidents at onshore wind farms in China, 0 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Power Plant Database v1.3.0, World Resources Institute, licensed under CC BY 4.0. The dataset. This dataset was last updated in 2021; the site may have changed since. The register adds only the incidents and the counts.