Around this site

← Back to Gabès

Solar · Tunisia

Voltalia-Menzel Habib solar farm

Planned (permitted)139 MWChecked 8 October 2026Last changed in the dataset 25 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Voltalia-Menzel Habib solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
139 MW
Status
Planned (permitted) (Pre-construction)
Operator
Voltalia
Owner
Tunisian Ministry of Industry, Energy and Mines
Location
East Douz, Gabès, Tunisia
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Voltalia-Menzel Habib solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.