Toru-Aigyr solar farm

Planned (permitted)300 MWChecked 8 October 2026Last changed in the dataset 5 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Toru-Aigyr solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
300 MW
Status
Planned (permitted) (Pre-construction)
Operator
Bishkek Solar
Owner
Bishkek Solar LLC [100%]
Location
Issyk-Kul, Kyrgyzstan
First operating
2026
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Toru-Aigyr solar farm. If you know of one, report it (confidential reports are anonymised).