← Back to Choluteca

Onshore wind · Honduras

San Marcos (Total Eren) wind farm

Planned (permitted)118 MWChecked 8 October 2026Last changed in the dataset 18 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for San Marcos (Total Eren) wind farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
118 MW
Status
Planned (permitted) (Pre-construction)
Operator
Total Eren
Owner
TotalEnergies SE
Location
San Marcos de Colón, Choluteca, Honduras
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names San Marcos (Total Eren) wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.