Solar · Iraq

Samawa solar farm

Under construction750 MWChecked 8 October 2026Last changed in the dataset 14 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Samawa solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
750 MW
Status
Under construction (Construction)
Operator
Power Construction Corporation of China
Owner
Ministry of Electricity (Iraq) [100%]
Location
Samawa, Muthanna, Iraq
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Samawa solar farm. If you know of one, report it (confidential reports are anonymised).