Around this site

← Back to Dhofar

Onshore wind · Oman

SalalaH2 wind farm

Planned (permitted)1550 MWChecked 8 October 2026Last changed in the dataset 6 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for SalalaH2 wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1550 MW
Status
Planned (permitted) (Pre-construction)
Operator
Dutco; Linde; Marubeni; OQ
Owner
Energy Development Oman SAOC [100%]
Location
Salalah, Dhofar, Oman

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names SalalaH2 wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.