Around this site

← Back to Las Tunas

Onshore wind · Cuba

La Herradura wind farm

Under construction113 MWChecked 8 October 2026Last changed in the dataset 14 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for La Herradura wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
113 MW
Status
Under construction (Construction)
Operator
Empresa Desarrolladora de Inversiones para Fuentes Renovables de Ener­gía
Owner
Union Electrica de Cuba [100%]
Location
Las Tunas, Cuba
Phases in the tracker
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names La Herradura wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.