Solar · Zambia

Kalulushi Concentrating Solar Power Plant

Planned (permitted)400 MWChecked 8 October 2026Last changed in the dataset 22 January 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kalulushi Concentrating Solar Power Plant sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
400 MW
Status
Planned (permitted) (Pre-construction)
Owner
Kaidi New Energy Co [30%]; Margam Valley Solar Energy Corp [70%]
Location
Kalulushi, Kalulushi District, Copperbelt, Zambia
First operating
2026
Phases in the tracker
3

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Kalulushi Concentrating Solar Power Plant. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.