Around this site

← Back to New Valley

Onshore wind · Egypt

ACWA wind farm

Under construction11100 MWChecked 8 October 2026Last changed in the dataset 10 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for ACWA wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
11100 MW
Status
Under construction (Construction)
Operator
ACWA Power; Nasr General Contracting (HASSAN M. ALLAM)
Owner
Nasr General Contracting (HASSAN M. ALLAM) [25%]; ACWA Power Co [75%]
Location
New Valley, Egypt
First operating
2027
Phases in the tracker
3

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names ACWA wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.